Load Oracle Primavera Cloud data in Python using dltHub

Build a Oracle Primavera Cloud-to-database pipeline in Python using dlt with AI Workbench support for Claude Code, Cursor, and Codex.

Last updated:

Oracle Primavera Cloud REST API provides a flexible interface to Oracle Primavera Cloud functionality. The REST API base URL is https://<SERVER_URL>/api/restapi/ and uses OAuth-based Bearer token authentication obtained via Basic Authentication or an OIDC/Lobby-based token endpoint.

dlt is an open-source Python library that handles authentication, pagination, and schema evolution automatically. dlthub provides AI context files that enable code assistants to generate production-ready pipelines. Install with uv add "dlt[hub]" and start loading Oracle Primavera Cloud data in under 10 minutes.


What data can I load from Oracle Primavera Cloud?

Here are some of the endpoints you can load from Oracle Primavera Cloud:

ResourceEndpointMethodData selectorDescription
activities/activity/project/{projectId}GETRetrieves a paginated list of activities for a specific project.
projects/projectGETRetrieves a list of all projects.
workspaces/workspaceGETRetrieves a list of all workspaces.
resources/resourceGETRetrieves a list of resources.
users/userGETRetrieves a list of all users in the environment.

How do I authenticate with the Oracle Primavera Cloud API?

Requests require the 'Authorization' header with a 'Bearer' token. Additionally, specific tenancy headers such as 'x-prime-tenant-code' must be included as retrieved from the token generation response.

1. Get your credentials

To obtain API credentials, you must first register your integration in the Oracle Construction and Engineering Lobby. 1. Log in to the Lobby and navigate to 'OAuth Clients'. 2. Create a new OAuth client (choose 'Non-Interactive Integration' for machine-to-machine access). 3. Upon registration, you will receive a Client ID and Client Secret. 4. If necessary, locate existing credentials by navigating to 'Identity' > 'Domains' > [Your Domain] > 'Oracle Cloud Services' in your OCI Console, selecting your application, and selecting 'Show Secret' in the General Information section. Ensure these credentials are kept secure and are never exposed publicly.

2. Add them to .dlt/secrets.toml

[sources.oracle_primavera_cloud_source] api_key = "REPLACE_ME"

dlt reads this automatically at runtime — never hardcode tokens in your pipeline script. For production environments, see setting up credentials with dlt for environment variable and vault-based options.


How do I set up and run the pipeline?

Set up a virtual environment and install dlt:

uv init uv add "dlt[hub]"

1. Install the dlt AI harness:

uv run dlthub ai init --agent <your-agent> # <agent>: claude | cursor | codex

This installs project rules, a secrets management skill, appropriate ignore files, and configures the dlt MCP server for your agent. Learn more →

2. Install the rest-api-pipeline toolkit:

uv run dlthub ai toolkit install rest-api-pipeline

This loads the skills and context about dlt the agent uses to build the pipeline iteratively, efficiently, and safely. The agent uses MCP tools to inspect credentials — it never needs to read your secrets.toml directly. Learn more →

3. Start LLM-assisted coding:

Use /find-source to load data from the Oracle Primavera Cloud API into DuckDB.

The rest-api-pipeline toolkit takes over from here — it reads relevant API documentation, presents you with options for which endpoints to load, and follows a structured workflow to scaffold, debug, and validate the pipeline step by step.

4. Run the pipeline:

uv run python oracle_primavera_cloud_pipeline.py

If everything is configured correctly, you'll see output like this:

Pipeline oracle_primavera_cloud_pipeline load step completed in 0.26 seconds 1 load package(s) were loaded to destination duckdb and into dataset oracle_primavera_cloud_data The duckdb destination used duckdb:/oracle_primavera_cloud.duckdb location to store data Load package 1749667187.541553 is LOADED and contains no failed jobs

Inspect your pipeline and data:

uv run dlthub show

This opens the Pipeline Dashboard where you can verify pipeline state, load metrics, schema (tables, columns, types), and query the loaded data directly.


Python pipeline example

This example loads /api/restapi/project and /api/restapi/action from the Oracle Primavera Cloud API into DuckDB. It mirrors the endpoint and data selector configuration from the table above:

import dlt from dlt.sources.rest_api import RESTAPIConfig, rest_api_resources @dlt.source def oracle_primavera_cloud_source(api_key=dlt.secrets.value): config: RESTAPIConfig = { "client": { "base_url": "https://<SERVER_URL>/api/restapi/", "auth": {"type": "bearer", "token": api_key}, }, "resources": [ {"name": "activities", "endpoint": {"path": "activity/project/{projectId}"}}, {"name": "projects", "endpoint": {"path": "project"}} ], } yield from rest_api_resources(config) def get_data() -> None: pipeline = dlt.pipeline( pipeline_name="oracle_primavera_cloud_pipeline", destination="duckdb", dataset_name="oracle_primavera_cloud_data", ) load_info = pipeline.run(oracle_primavera_cloud_source()) print(load_info)

To add more endpoints, append entries from the resource table to the "resources" list using the same name, path, and data_selector pattern.


How do I query the loaded data?

Once the pipeline runs, dlt creates one table per resource. You can query with Python or SQL.

Python (pandas DataFrame):

import dlt data = dlt.pipeline("oracle_primavera_cloud_pipeline").dataset() sessions_df = data.activities.df() print(sessions_df.head())

SQL (DuckDB example):

SELECT * FROM oracle_primavera_cloud_data.activities LIMIT 10;

In a marimo or Jupyter notebook:

import dlt data = dlt.pipeline("oracle_primavera_cloud_pipeline").dataset() data.activities.df().head()

See how to explore your data in marimo Notebooks and how to query your data in Python with dataset.


What destinations can I load Oracle Primavera Cloud data to?

dlt supports loading into any of these destinations — only the destination parameter changes:

DestinationExample value
DuckDB (local, default)"duckdb"
PostgreSQL"postgres"
BigQuery"bigquery"
Snowflake"snowflake"
Redshift"redshift"
Databricks"databricks"
Filesystem (S3, GCS, Azure)"filesystem"

Change the destination in dlt.pipeline(destination="snowflake") and add credentials in .dlt/secrets.toml. See the full destinations list.


Next steps

Continue your data engineering journey with the other toolkits of the dltHub AI harness:

  • data-exploration — Build custom notebooks, charts, and dashboards for deeper analysis with marimo notebooks.
  • dlthub-platform — Deploy, schedule, and monitor your pipeline in production.
uv run dlthub ai toolkit install data-exploration uv run dlthub ai toolkit install dlthub-platform

Was this page helpful?

Community Hub

Need more dlt context for Oracle Primavera Cloud?

Request dlt skills, commands, AGENT.md files, and AI-native context.

Available Pipelines